Predictive
Maintenance
Preventative maintenance (PM) has long
been a tool that electrical utilities use to extend the life of their
equipment. However,
in today's economy PM programs are becoming prohibitively expensive.
Gone are the days of changing transformer oil on a timed schedule. Utilities
today are beginning to turn to a more scientific approach to testing
and maintenance. This process is called Predictive Maintenance (PdM).
PdM programs, like PM programs help to extend the life of your assets.
However, a well put together PdM will allow you to focus your maintenance
budget where it is needed the most based on the actual health of your
equipment.
Turn
Key Power offers an array of cost effective, customizable PdM programs.
These programs include various forms of thermal inspections, transformer
oil analysis and visual inspection. Programs are tailored to reduce equipment
failures and your maintenance budget.
|
|
|
Thermal
Inspections
Thermal
imaging is one of the most effective methods of detecting potential
problems with your T&D assets. A thermographer
can identify loose or corroded connections, low transformer
oil levels, overheating transformers and/or bushing caps,
unbalanced heat loads and more. Thermographic surveys improve
maintenance
effectiveness and reduce maintenance cost. They also improve
system reliability, reduce down-time and potentially save
your expensive equipment from catastrophic failure.
Turn
Key Power uses Fluke's Ti25 thermal imager to search for potential
issues within you T&D system. This state-of-the-art imager
allows the thermographer many options to evaluate and display potentials
problems, making corrective action decisions a snap.
|
| |
|
Transformer
Oil Analysis
Transformers are one of the most
expensive components of your T&D assets. With the skyrocketing
cost of materials it is more important now than ever to protect
your infrastructure.
85% of oil filled transformer failures are caused by moisture
in the oil. Most of these failures could have been avoided by
an inexpensive
testing regiment. The total cost of a transformer failure typically
costs between 5 and 20 times the cost of the transformer.
Turn Key Power has partnered with Transformer Service, Inc. (TSI),
a leading transformer service organization. With testing programs
such
as oil
quality,
dissolved
gas and dissolved metals, we can tailor fit a cost effective testing
regiment to help protect your equipment and reduce your maintenance
cost. Test
for PCBs in oil, water, soil, surfaces (porous and non-porous
solids) and air are also available. We recommend that oil filled
equipment
is tested for PCBs at the beginning of a PdM program and then
every following three to five years.
|
|
|
| |